Global Composting - Geelong
This two phase project involved electrical design, MCC build, installation and commissioning of HotRot Twin 1811 composting system (www.globalcomposting.solutions).
Full turn key project featuring: initial electrical demand calculations, solar and generator interfacing, electrical schematics, software development, machine safety, installation and commissioning.
The control system consists of an Allen Bradley MicroLogix 1400 PLC, Beijer iX X2 Pro12 HMI, Sick Flexisoft CPU0 safety relay kit and eWON remote gateway.
Phase 1: Travel to Geelong was not an option due to Covid restrictions; this required us to further develop our electrical schematics and create cable schedules for local installers.
We provided remote support to installers.
We remotely commissioned the system (via eWON).
Phase 2: We travelled to site for electrical installation and commissioning.